Hydrogen in Germany

The hydrogen core network links production sites, import routes and consumption centres, thus laying the foundation for the market ramp-up of hydrogen in Germany. GASCADE plays a significant role in the realisation of the hydrogen core network. A grid connection to our pipeline network gives producers and consumers access to the national hydrogen infrastructure.

Hydrogen core network

To ensure a swift ramp-up of the hydrogen market, legislators have commissioned the transmission system operators to develop a Germany-wide H2 core network that is efficient, can be implemented quickly and be expanded. The aim is to connect the main hydrogen production sites and import points with the hydrogen consumption centres and storage facilities. The GASCADE projects Flow – making hydrogen happen and AquaDuctus, which are both part of the core network, are making a major contribution to creating these connections. In addition, GASCADE is also involved in the hydrogen core network with other new development projects that are of vital importance primarily for the east-west connection within Germany and for connecting potential H2 terminals. 

In October 2024, the Federal Network Agency approved the hydrogen core network. 

 

Hydrogen core network of FNB Gas e.V.

Capacity Reservations for Hydrogen Transport in the Core Network

Model contract for capacity reservations in the hydrogen core network agreed
As part of the development of the hydrogen cooperation agreement, standard model contracts for capacity reservations in the hydrogen core network were agreed. These were also published on March 5, 2026, by the participating associations BDEW, VKU, and GEODE.

Reservation fee for capacity reservations
The hydrogen core network operators are standardising the reservation fee for all requests received from 05/11/2026 onwards, i.e. seven calendar days after the publication of this fourth market information package, published on 29 October 2026. From that date, the reservation fee will amount to 1/25 of the currently applicable ramp-up fee, subject to a minimum of €9,000 per year per reservation. 

Based on the ramp-up charge for 2025 set by the BNetzA at 25 €/kWh/h per year, an adjustment for inflation is applied in line with the Consumer Price Index. For 2026, the ramp-up charge will be 25.55 €/kWh/h per year. The reservation charge in 2026 will therefore amount to 1.02 €/kWh/h per year from the date specified above. For 2027, a ramp-up tariff of 26.11 €/kWh/h per year has been set. This results in a reservation fee of 1.04 €/kWh/h per year for 2027.

Capacity Reservation Request
You can use the form for requesting capacity reservations in the hydrogen core network to submit a request for the following network point types:

  • Network point types that can be reserved with THE:
    • Cross-cluster transport (CÜT)
  • Network point types that can be reserved with the Hydrogen Core Network Operators (WKNB):
    • Point of withdrawal to end consumers (NAP)
    • Border transfer point (GÜP)
    • H₂ terminal
    • Domestic production facility
    • Hydrogen storage facility

Please select the network point type appropriate for your project and submit your request using the provided form. A binding request can be submitted starting on 19 March 2026, at 1:00:00 p.m. CET. Earlier requests will not be considered.

A Know-Your-Customer (KYC) check will be conducted concurrently with the processing of the request.

Please don't hesitate to contact us!

more information

Any questions about Capacity Reservations?

Behnoosh Farahani

Behnoosh Farahani

Contract Management

Telephone: +49 561 934-1279

send e-mail

Dr. Dirk Flandrich

Head of Program Flow – making hydrogen happen

Telephone: +49 561 934-2526

send e-mail

Ilina Rose

Ilina Rose

Contract Management

Telephone: +49 561 934-1340

send e-mail

Dominik Stolz

Dominik Stolz

Head of Team Contract Management

Telephone: +49 561 934-1376

send e-mail

Grid connection to the hydrogen core network

Are you a hydrogen producer or would you like to obtain hydrogen for your company or project)?

For a planned connection to the hydrogen core network, a network connection request must be submitted. Send us a short description of your entry or exit project with the relevant parameters of the desired grid connection using these term sheets by email to H2-NetzanschlussSpam Protect@gascade.de. The possibility of implementation will be checked by GASCADE and the result will be communicated to you. If you agree, we will work with you to draw up the necessary contracts (installation contract and grid connection/grid coupling contract, etc.). You can find sample contracts in our General Terms and Conditions of Network Connection-H2.

Any questions about grid connection?

Steffen Busse

Contract Management,
Hydrogen,
Internal Ordering

Telephone: +49 561 934-1598

send e-mail

Gerda Suresch

Gerda Suresch

Contract Management
Hydrogen,
Internal Ordering

Telephone: +49 561 934-1267

send e-mail

Martin Vogts

Martin Vogts

Capacity Management / Contract Management

Telephone: +49 561 934-1362

send e-mail