Grid access
- General Terms & Conditions for Entry/Exit Contracts As of 15 August 2022, valid from 1 October 2022
- Grid points and Gas Specification as of 26/03/2024, valid 01/04/2024–14/07/2024
- Grid points and gas specification as of 04/07/2024, valid 15/07/2024–30/09/2024
- Grid points and gas specification as of 04/07/2024, valid from 01/10/2024
- Price list of GASCADE Gastransport GmbH for Shippers and Network Operators, as of 15 July 2024, valid from 1 January 2024
- Price list of GASCADE Gastransport GmbH for Shippers and Network Operators, as of 15 July 2024, valid from 1 October 2024
- Price list of GASCADE Gastransport GmbH for Shippers and Network Operators, as of 15 July 2024, valid from 1 January 2025
- Allocation Restrictions for Dynamically Allocable Capacities (DZK) As of 19 December 2023, valid from 1 October 2023
- Allocation Restrictions for Dynamically Allocable Capacities (DZK) As of 29 May 2024, valid from 1 October 2024
- Conditions for the firm usage for the conditionally firm, freely allocable capacities with temperature dependency (bFZKtemp) As of 1 October 2021
- Request for Invoicing of Fees for Discounted Gas Quantities As of 7 April 2022
Capacity booking requests in exceptional cases
- Capacity booking request in case of a downtime of the primary capacity platform or connected systems (backend)
- Capacity booking request in case of a downtime of the primary capacity platform or connected systems (backend) pursuant to Paragraph 1 of Section 1 of the General Terms and Conditions for Entry‐/Exit‐Contracts of GASCACDE Gastransport GmbH
- Request form for increase of entry/exit capacity
Biogas
- Special terms for connecting biogas plants to the pipeline network of GASCADE as of 17/05/2024 (German language version)
- Form for specifying the biogas plant Appendix 1
- Reporting form for biogas costs Reporting of actual Biogas Costs 2023 and projected Costs 2025 (German language version)
Metering and operating of metering points
- Conditions for Operation of Metering Points (German language version)
Capacity planning
General Documents
- Benutzerinformation zur Primärkapazitätsplattform as of 23 October 2015
- Certificate ISO/IEC 27001 as of 17 December 2020
- Certificate (IT-Sicherheitskatalog gemäß § 11 Abs. 1a EnWG) as of 15 December 2020
- Certificate DIN EN ISO 9001:2015 as of 22 July 2023
Market Information
Archive
Here you will find all archived documents.