The GASCADE pipeline network is a hub for natural gas transport within Europe. Since gas production in Europe is on the decline and consumers in the future will be more dependent on imports, our network plays a decisive role.
In a nutshell
Pipeline network:
3,710 km
Entry & Exit points:
88
Border entry/exit points:
7
Simultaneous annual maximum load (2023):
59,182 MW
Total quantity transported (2023):
about 24 Bln. m³
The GASCADE infrastructure
Click any compressor station or pipeline for further information.