The GASCADE pipeline network is a hub for natural gas transport within Europe. Since gas production in Europe is on the decline and consumers in the future will be more dependent on imports, our network plays a decisive role.
In a nutshell
Pipeline network:
3,710 km
Entry & Exit points:
105
Border entry/exit points:
7
Simultaneous annual maximum load (2022):
81,399 MW
Total quantity transported (2022):
about 39 Bln. m³